Project Works have begun to improve conditions at BEPS. Here’s where we are at:
Toilets
We have met with the Project Manager and now we need to get the paper work done, engineer reports, and plans so that we are ready for work to be done during the Christmas holidays.
Windows and Pipes
First stage of window renovations have been completed. All windows that were structurally a worry have now been repaired or replaced. Down pipes that needed to desperately be replaced have been done. We still have a way to go but it feels good to have started.